August & September 2023 - Report of the month

The 08 October 2023

Here is the report of the month for August and September 2023.

I. Introduction


I couldn’t do the August one, the month of September was very busy personally, I had to postpone and group the 2 months.

Topics that we will cover in this report:

Here is the menu for this report.


II. Project events


II.1. Community testing

The first user test was carried out from August 31 to September 2.

Obviously, not everything is finalized, so some feedback was logical, others more interesting.

Here is the feedback, with my comments in italics:

More related to FusionInventory:

This first test allowed me to raise a few points that I had not yet thought about, it will help refine the display.

We will plan another test, rather at the end of November.


III. Development


III.1. Backend


III.1.a Workflow

The workflows are a little more complex than I thought. There is already quite a bit of working code (FusionInventory, webhook, etc.) but others still require a little work. The slider between ease of use and power/complexity of workflows necessarily takes time.

Despite that, it works more in the direction I want, so that’s a good point.

The workflow part is the most important building block of FusionSuite.


I started to develop the item search.

This project is quite well advanced and I am currently writing tests in parallel with the code.


III.1.c Planning

At the backend level, there are still 2 major features to complete for the release:


III.2 Frontend


III.2.a Workflow management

The interface has evolved, we have a menu to configure each block, there is still ergonomic work to be done on it to be as simple as possible to use, but the first draft is a good working basis.

On a technical level, I had to separate all the blocks in the code to greatly simplify the code and therefore the maintenance for later.


III.1.b Search

I started to develop the item search.

This project is quite well advanced and I am currently writing tests in parallel with the code.


III.1.c Planning

At the backend level, there are still 2 major features to complete for the release:


III.2 Frontend


III.2.a Workflow management

The interface has evolved, we have a menu to configure each block, there is still ergonomic work to be done on it to be as simple as possible to use, but the first draft is a good working basis.

On a technical level, I had to separate all the blocks in the code to greatly simplify the code and therefore the maintenance for later.


The search part of the interface allows you to do somewhat complex searches (contains, greater than, starts with…) depending on what you are looking for (name, property).

I implemented 2 ways to use search:

Everything is not finished yet, but rather very advanced on the interface side and will be finalized in October.


III.2.c Display

I have started to improve all the little things in the interface that need a pass of tweaking, improvement, the work will continue over the next 3 months.


III.2.d Planning

At the frontend level, it remains to be finished for the release:


IV. Conclusion

The project is nearing completion for the first release, after more than 2 years of development, I can’t wait to put it all in your hands \o/.

David Durieux - FusionSuite project leader